Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Latest cars crash tested by Euro NCAP

Thu, 24 Oct 2013

CRASH TEST results have been announced by the European vehicle safety body Euro NCAP, after testing of the latest new cars to reach the market. Amongst the vehicles tested were the Mercedes-Benz CLA, the Jeep Cherokee, the Peugeot 2008 and the Suzuki SX4. Despite varying on cost and size, all four of the vehicles tested scored the maximum five star overall rating.

Volkswagen Passat Executive and Executive Style

Thu, 02 Jan 2014

Volkswagen’s moving up in the world with the introduction of the Executive and Executive Style to its Passat range. The two new models add a bit of luxury and bling to the current Passat, ahead of rumours of an all-new version coming in 2015. Find out how much a used Volkswagen Passat costs on Auto Trader On Bing: see pictures of the Volkswagen Passat The new Passat Executive is fitted with 17-inch alloys (an inch bigger than standard on the base-spec ‘S’), as well as splashes of exterior chrome and matt black roof rails on the estate.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.